Instructions regarding War Diaries and Intelligence Summaries are contained in F.S. Regs., Vol. 1. and the Staff Manual respectively Title pages will be prepared in manuscript. |
WAR DIARY or INTELLIGENCE SUMMARY |
Army Form C.2118 |
Unit: 15 Bridging Platoon R.E. | ||
Month and Year: June 1944 | (Erase heading not required). | Commanding Officer: Lt. G. Sumner R.E. |
Place | Date | Hour | Summary | Reference |
---|---|---|---|---|
SOUTHAMPTON | 1 | Dep. C.21 Camp to docks. | ||
2 | 0100 | Embarked for operations overseas. Ships routine. | ||
3 | On board. Ships routine. | |||
4 | ditto | |||
5 | ditto | |||
6 | Arrived off French coast D Day. Landings held up owing to rough seas. | |||
FIELD | 7 | Disembarked dryshod and proceeded to CRÉPON. Two snipers taken prisoner at CREPON. | ||
8 | Moved to area SOMMERVIEU. | |||
9 | Checking and sorting of stores. | |||
10 | Drew Bailey stores from R.A.S.C. and handed in surplus stores to R.E. stores B.M.A. | |||
11 | Maintenance of Bailey Equipment and De-waterproofing. | |||
12 | ditto | |||
13 | ditto | |||
14 | Returned to normal Field routine. | |||
15 | No change. | |||
16 | Bailey Equipment delivered to 295 Field Company R.E. for training scheme No. 1 | |||
17 | Bailey Equipment loaded onto vehicles. | |||
18 | Bailey Equipment delivered to 295 Field Company R.E. for training scheme No. 2 | |||
19 | Unit site moved to area LA VALLIERS. Loading Bailey Equipment back onto vehicles. | |||
20 | Cleaning and regreasing of Bailey stores. | |||
21 | Maintenance of vehicles and Camp Area. | |||
22 | Moved to new location CACLEY. One Willys jeep sent to W/s for repair. | |||
24 | No change. | |||
25 | Bailey Equipment delivered to 295 Field Company R.E. for training scheme No. 3. Bailey Equip. reloaded and returned to camp by 2330 hrs. | |||
26 | Checking and regreasing of stores. | |||
27 | Bailey Equip. delivered to 295 Field Coy., (40 ft D.S.) and 233 Field Coy., (40 ft D.S.) for training schemes No. 4 and 5. Equip. reloaded and returned by 2000 hrs. | |||
FIELD | 28 | Re-checking of Equipment. Small stores inspection. 1 Jeep returned to unit. | ||
29 | 4 Panel lorries to have superstructure placed in them to ease carrying of Panels. | |||
30 | First 2 panel lorries unloaded and superstructure placed in position. Panels re-loaded onto vehicles. |
Disclaimer: This War Diary is based on its original, but typos might be corrected. For historical research, always check the originals.