Instructions regarding War Diaries and Intelligence Summaries are contained in F.S. Regs., Vol. 1. and the Staff Manual respectively Title pages will be prepared in manuscript. |
WAR DIARY or INTELLIGENCE SUMMARY |
Army Form C.2118 |
Unit: CE 8 Corps | ||
Month and Year: April 1944 | (Erase heading not required). | Commanding Officer: Brig. H.H.C. Sugden, DSO, OBE |
Place | Date | Hour | Summary | Reference |
---|---|---|---|---|
Norco | 1 - 21 | Gds Armd Div RE engaged on Trails of Close Support Raft | ||
Norco | 2 - 8 | 8 Corps Tps RE engaged on rd demolitions and repairs | ||
4 - 5 | 278 Fd Coy (15 Div) engaged on crater filling exercise | |||
6 -8 | 20 Fd coy ( 15 Div) engaged on crater filling exercise | |||
6 - 12 | 15 Div RE units engaged on setting out for construction of Cl 40 rd lecture by CE Norco on Anti-mine devices | |||
10 - 14 | 14 Fd Sqn RE (Gds Arm Div) constructed 80' Cl 70 BB at SNAITH | |||
12 | Lecture by CE Norco on Anti-mine devices | |||
14 - 15 | Ce Branch moved with HQ to SECO. | |||
16 - 30 | 224 Fd Coy and 101 Fd Coy engaged on work at Ordnance Depot, BICESTER | |||
17 - 22 | 14 Fd Sqn RE (Gds Arm Div) - construction of Cl 9 Improvised Br and construction and operation of water point |
Disclaimer: This War Diary is based on its original, but typos might be corrected. For historical research, always check the originals.